Mineral Resource & Ore Reserve Estimates
Mineral Resource Estimate
The Mineral Resource estimate for the Central Musgrave Project is in compliance with the JORC Code (2012 Edition) and as of 30 June 2016 and was published on 18 August 2016. There has been no change to the Mineral Resource estimate since the date of this publication.
CENTRAL MUSGRAVE PROJECT MINERAL RESOURCE ESTIMATE

- Mineral Resources are reported inclusive of Mineral Resources modified to produce the Ore Reserve;
- Tonnes are reported as million tonnes (Mt) and rounded to nearest 100,000; nickel tonnes are reported as thousand tonnes (kt) and rounded to the nearest 1000 tonnes; cobalt tonnes are reported as thousand tonnes (kt) and rounded to the nearest 100 tonnes; rounding may result in some slight apparent discrepancies in totals.
Ore Reserve Estimate
The Ore Reserve estimate for the Wingellina Nickel-Cobalt Project is in compliance with the JORC Code (2012 Edition) and as of 30 June 2016 and was published on 18 August 2016. There has been no change to the Ore Reserve estimate since the date of this publication.
WINGELLINA NICKEL-COBALT PROJECT ORE RESERVE ESTIMATE

- The Ore Reserve is based on the Wingellina Mineral Resource estimate as of 30 June 2016 with applied modifying factors, at a cut-off grade of 0.5% Ni;
- Tonnes are reported as million tonnes (Mt) and rounded to nearest 100,000; nickel tonnes are reported as thousand tonnes (kt) and rounded to the nearest 1000 tonnes; cobalt tonnes are reported as thousand tonnes (kt) and rounded to the nearest 100 tonnes; rounding may result in some slight apparent discrepancies in totals.
Competent Person’s Statements
The information in this report that relates to nickel Mineral Resources was compiled by Metals X technical employees and contractors under the supervision of Mr. Jake Russell B.Sc. (Hons), who is a member of the Australian Institute of Geoscientists. Mr Russell, at the date of the Mineral Resource estimate, was a full time employee of the Company, and has sufficient experience which is relevant to the styles of mineralisation and types of deposit under consideration and to the activities which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Russell consents to the inclusion in this report of the matters based on his information in the form and context in which it appears.
The information in this report that relates to nickel Ore Reserves was compiled by Metals X technical employees under the supervision of Mr Michael Poepjes BEng (Mining Engineering), MSc (Min. Econ) MAusIMM. Mr Poepjes, at the date of the Ore Reserve estimate, was a full-time employee of the Company. Mr Poepjes has sufficient experience which is relevant to the styles of mineralisation and types of deposit under consideration and to the activities which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Poepjes consents to the inclusion in this report of the matters based on his information in the form and context in which it appears.
Watch THE Wingellina Movie
The Wingellina Nickel-Cobalt Project – October 2008